The State of Georgia-supported funding program has opened a Business Resource Support Center to help disadvantaged and registered small businesses that have experience in identifying and responding to business opportunities funded by the 2015 Transportation Finance Act. These include a delay in routine national maintenance projects such as crack sealing; Pothole Repair Concrete Slab Repair Drainage Works Roads Safety Chute Repairs Regulatory Track Compensation; maintenance of vegetation during tree felling; mowing; Pick up throws and more. These routine maintenance activities offer CEOs and small and medium-sized businesses – who may not have yet worked with Georgia DOT – the opportunity to establish themselves as qualified contractors for project applications. For more information on the OTDT State Support Program, see gdotstateprojects.com/ May 23 – 10 a.m – 12 P.m. – Georgia DOT – Thomaston District Office 115 Transport Blvd – Auditorium A, Thomaston, GA 30286 The Georgia Department of Transportation (GDOT) laid the groundwork for a $500 million highway project near Macon, GA last week, according to Equipment World. Interested parties are invited to participate in [email protected] or submit written comments by 16 July 2012. GDOT`s DBE program aims to increase the participation of minority and female companies in contracts through the National Transportation Agency, in accordance with the federal requirements of the DBE. May 24 – 10:00 – 12:00 – Chatham County/Savannah Metropolitan Commission 110 East State Street, Savannah, GA 31412 For more information, please contact the Georgian Office of Equal Opportunity at 404-631-1972. The details are listed below. Licensed small businesses looking to continue operating with the Georgia Department of Transportation (GDOT) now have a resource designed specifically for this purpose. The event will take place at the Emory Conference Center Hotel, 1615 Clifton Road, Decatur, GA 30329. An overview of the disparity study was submitted to the GDOT on April 18, 2012 and a copy of this presentation is available at www.dot.ga.gov/doingbusiness/dbePrograms/Documents/Presentations/DisparityStudy-BoardPresentation.pdf. The objective of this public consultation session is to gather information on the availability of disadvantaged and non-disadvantaged companies, the impact of discrimination on the opportunities offered to the DBE and the Ministry`s efforts to ensure a level playing field for the participation of DBE companies in the Ministry`s contracts and projects.
In order to minimize the negative impact on traffic, the project will be implemented in seven phases, the first of which is scheduled for summer 2018. GDOT has contracts for the first four phases for a total of $268.8 million. The Support Services Advisor of the Georgian Ministry of Transport, MH Miles Company CPA, PC, is organizing a national conference “Blueprint for Success” on Tuesday, September 10, 2013. The meeting will take place from 10 a.m. to 12.m.m .m .m to Friday, June 15 at the Ministry`s General Office at 600 West Peachtree Street, nw. The GDOT requested advice on the draft study and its conclusions. Comments on the disparity study can be submitted by completing the Public Comment Form (.pdf, 143K) or by sending an email to [email protected]. The Interstate 16/Interstate 75 upgrade project will separate local traffic from through traffic, which would reduce the number of accidents, according to GDOT officials. The improvements also aim to reduce overall congestion, improve access to downtown Macon and improve travel conditions between the Port of Savannah and Atlanta. In particular, gdot`s 2012 disparity study analyzes GDOT`s DBE program for minority enterprises (MBE)/women`s enterprises (WBE) and disadvantaged enterprises (DBE) in GDOT construction and engineering contracts from 2009 to June 2011.
In addition, a public position is required in three public forums held throughout the state. .
Son Yorumlar